Project Overview
Powertherm has successfully completed the design, supply, and installation of over 26,000m² of industrial insulation and cladding at the Skelton Grange Energy-from-Waste (EfW) facility in Leeds, Yorkshire.
Working in partnership with Hitachi Zosen Inova (now Kanadevia Inova), the project supports a state of the art plant capable of generating 49MW of energy, enough to power around 100,000 homes…while diverting 410,000 tonnes of residual waste from landfill each year.
Combining in-house insulation system design with expert on-site installation, Powertherm delivered a fully integrated solution across critical systems including the boiler, flue gas treatment, and water steam cycle. The project required precise engineering to meet strict thermal performance targets, including safe surface temperatures and controlled heat loss, all in line with BS 5970 standards.
At peak, a workforce of 45 ensured the project was delivered safely, on time, and to the highest technical standards.
Read the full case study to explore how Powertherm overcame complex technical challenges and delivered a high-performance insulation solution Here>>