Discover the Power Behind Slough Multifuel – A Powertherm Project 🏭
Powertherm proudly played a pivotal role in delivering Slough Multifuel energy-from-waste plant ahead of schedule!
The impact:
➡️ Over 30,000m² of Technical Industrial Insulation/ Sheet Metal Cladding solutions.
➡️ More than 3000 Flexible Insulation Covers, manufactured in-house and fitted at site.
➡️ 8,000+ lin/m of trace heating cable installed.
➡️ Delivered by a skilled team of 50+ professionals with zero RIDDOR reportable incidents.
➡️ Helping the plant efficiently convert 480,000 tonnes of waste into 60MW of electricity annually and up to 92MW of thermal power per line.
Curious about how Powertherm’s industrial service expertise ensured project success?
Read the case study HERE: